Metro Consulting Associates (MCA) is providing a full suite of land surveying services to support right of way (ROW) acquisition, routing and re-routing, construction, and post-construction activities for this new gas line to service residents in Shipshewana and Middlebury. Key services include, but are not limited to, route surveys, topographic surveys, easement exhibits, constructions staking, and as-built construction surveys.
Working closely with our land surveying team, our land agents are actively working to acquire 45 separate easements or access agreements with landowners along the project route.
Our ecological team conducted on-site wetland and stream assessment/delineation activities within the 75-foot-wide easement along the entire project corridor which identified a total of 11 wetlands, two potential wetlands, five streams, and three ponds. Thanks to re-routing activities, no permanent impacts to streams and wetlands will occur. In locations where the gas line will cross wetlands, disturbance from the open trench installation will be temporary and excavated wetland soils will be stockpiled and replaced per restoration plans.