Search

Status: Completed

  • January 29, 2021
    Metro Consulting Associates is providing a full suite of land surveying services to support right-of-way acquisition, routing and re-routing, construction,…
  • January 29, 2021
    Metro Consulting Associates performed courthouse research, ground survey showing property boundaries and road rights-of-ways, existing easements along route corridor, existing…
  • January 29, 2021
    The municipal team conducted a field investigation to identify and capture locations for hydrants, valves, meter pits, and curb stops.…
  • January 29, 2021
    Metro Consulting Associates provided balance of plant design services along with extensive ecological consulting to facilitate development.
  • January 29, 2021
    Metro Consulting Associates provided balance of plant design services along with extensive ecological consulting to facilitate development. A transportation plan…
  • January 29, 2021
    Originally constructed in 1973, the 24-inch OWC petroleum pipeline routes through rocky terrain, which contributed to integrity issues requiring 40-miles…
  • January 29, 2021
    Traversed by the Frank & Poet Drain, much of the 80-acre site is located within the 100-year floodplain. Metro Consulting…
  • January 29, 2021
    Ecological consulting included a wetland delineation and habitat assessment with report submission to the Michigan Department of Environment, Great Lakes…
  • January 29, 2021
    Due to funding constraints, the City was unable to perform regular maintenance activities on key assets including hydrants and valves,…
  • January 29, 2021
    Since the City’s Engineering Department did not exist for more than a decade, it was critical for return operations to…