Search

Status: Completed

  • May 15, 2024
    Metro Consulting Associates (MCA) completed extensive inspections and maintenance cleaning of approximately 744 of the City of Highland Park’s catch…
  • March 19, 2024
    Metro Consulting Associates (MCA) provided balance of plant design services for the wind farm which required coordination with the developer,…
  • January 29, 2021
    The cluster housing option selected for this development facilitated more open space with an enhanced stormwater management system and landscape…
  • January 29, 2021
    The survey team provided ground survey and base maps along the 3-mile corridor. To support the client’s land acquisition efforts,…
  • January 29, 2021
    Metro Consulting Associates is providing a full suite of land surveying services to support right-of-way acquisition, routing and re-routing, construction,…
  • January 29, 2021
    Metro Consulting Associates performed courthouse research, ground survey showing property boundaries and road rights-of-ways, existing easements along route corridor, existing…
  • January 29, 2021
    The municipal team conducted a field investigation to identify and capture locations for hydrants, valves, meter pits, and curb stops.…
  • January 29, 2021
    Metro Consulting Associates provided balance of plant design services along with extensive ecological consulting to facilitate development.
  • January 29, 2021
    Metro Consulting Associates provided balance of plant design services along with extensive ecological consulting to facilitate development. A transportation plan…
  • January 29, 2021
    Originally constructed in 1973, the 24-inch OWC petroleum pipeline routes through rocky terrain, which contributed to integrity issues requiring 40-miles…