    Metro Consulting Associates provided balance of plant design services along with extensive ecological consulting to facilitate development. A transportation plan…
  • January 29, 2021
    Originally constructed in 1973, the 24-inch OWC petroleum pipeline routes through rocky terrain, which contributed to integrity issues requiring 40-miles…
  • January 29, 2021
    Traversed by the Frank & Poet Drain, much of the 80-acre site is located within the 100-year floodplain. Metro Consulting…
  • January 29, 2021
    Ecological consulting included a wetland delineation and habitat assessment with report submission to the Michigan Department of Environment, Great Lakes…
  • January 29, 2021
    Since the City’s Engineering Department did not exist for more than a decade, it was critical for return operations to…
  • Grandview-Commons_Photo-2

    January 29, 2021
    Our team assisted with rezoning and area plan production to allow development as a Planned Unit Development. Permits for this…
  • January 29, 2021
    To kickstart the project, our survey team provided a constraints map that identified blanket easement impacts throughout the project site.
  • January 29, 2021
    Our survey team helped refine the proposed route along the chosen 50-mile corridor that connects refining, processing, and blending facilities.…
  • January 29, 2021
    Metro Consulting Associates provided pre-acquisition, right of way acquisition, land surveying, and construction support services for this new underground gas…
  • January 29, 2021
    Two separate Michigan Department of Environment, Great Lakes, and Energy (EGLE) permit application packages were prepared to obtain both a…