Service: Civil Engineering

  • January 29, 2021
    The cluster housing option selected for this development facilitated more open space with an enhanced stormwater management system and landscape…
  • January 29, 2021
    The survey team provided ground survey and base maps along the 3-mile corridor. To support the client’s land acquisition efforts,…
  • January 29, 2021
    The municipal team conducted a field investigation to identify and capture locations for hydrants, valves, meter pits, and curb stops.…
  • January 29, 2021
    Metro Consulting Associates provided balance of plant design services along with extensive ecological consulting to facilitate development.
  • January 29, 2021
    Metro Consulting Associates provided balance of plant design services along with extensive ecological consulting to facilitate development. A transportation plan…
  • January 29, 2021
    Originally constructed in 1973, the 24-inch OWC petroleum pipeline routes through rocky terrain, which contributed to integrity issues requiring 40-miles…
  • January 29, 2021
    Traversed by the Frank & Poet Drain, much of the 80-acre site is located within the 100-year floodplain. Metro Consulting…
  • January 29, 2021
    Ecological consulting included a wetland delineation and habitat assessment with report submission to the Michigan Department of Environment, Great Lakes…
  • January 29, 2021
    Due to funding constraints, the City was unable to perform regular maintenance activities on key assets including hydrants and valves,…
  • January 29, 2021
    Since the City’s Engineering Department did not exist for more than a decade, it was critical for return operations to…