GA Solar 4

Twiggs County, Georgia

Services:

Quick Facts

  • Largest solar power plant in the southeastern United States
  • 4 parcels spanning approximately 2,000 acres
  • 200MW AC photovoltaic solar generation asset

Project Summary

To kickstart the project, our survey team provided a constraints map that identified blanket easement impacts throughout the project site. 

In addition, the survey team provided topographic and ALTA/NSPS Land Title surveys for the entire development site to facilitate site engineering and construction. 

Once construction was complete, Metro Consulting Associates created As-Built ALTA/NSPS Land Title Surveys of the renewable power plant that identified key features such as fences, access roads, driveways, substations and inverters, solar array blocks, and stormwater basins and inlets. 